Civil works

We participated in numerous projects and of infrastructure, supplying high-strength concrete and latest generation asphalts.

Present in practically all infrastructures carried out at a national level.

Thanks to the range of products in this sector and the installed production capability, Calcinor participates in the majority of infrastructure projects that take place at a national level.

In general for major civil works Calcinor supplies the necessary materials, high-speed railway lines, retaining dikes, waste water treatment, bus stations and bridges,

Some examples of these civil works:

  • Fifth Donostia Bridge

    Location: Donostia.
    Completion date: 2010
    Supplies made: Concrete and pumping station.
    Detail: Suppliesdhigh strength concrete.

  • Urumea motorway roundabout

    Location: Hernani.
    Completion date: 2009
    Supplies made: Aggregate, concrete and pumping station.
    Detail: Elevated roundabout made with prestressed concrete.

  • Basque high-speed railway line

    Location: Urnieta/Hernani.
    Completion date: 2014
    Supplies made: Aggregate, concrete and pumping station.
    Detail: Tunnel of 2,300 m. Concrete supplied for first covering (gunite), lining, slabs and pavement.

  • Bilbao Airport

    Location: Bilbao.
    Completion date: February 2009
    Supplies made: Asphalt.
    Detail: Runway 12-30 reinforcement.

  • Capacity improvement of BI-631

    Location: Derio N-637.
    Completion date: June 2010
    Supplies made: Asphalt.
    Detail: Improved capacity of BI-631.

  • Arrasate Turnoff Road

    Location: Arrasate.
    Completion date: July 2010
    Supplies made: Asphalt.
    Detail: Arrasate Turnoff (Gipuzkoa).

  • South Metropolitan Turnoff Road

    Location: Bilbao.
    Completion date: September 2011
    Supplies made: Asphalt.
    Detail: South Metropolitan Turnoff Road (Trapagaran-Bizkaia).

  • Railway Line Modification

    Location: Lasarte.
    Completion date: March 2013
    Detail: Railway Line Modification - ETS (Donostia-Gizpuzkoa).

  • TMB Plant Bilbao

    Location: Bilbao.
    Completion date: December 2013
    Detail: TMB Plant Bilbao (Bilbao-Bizkaia).

  • High-speed Train

    Location: Bergara.
    Completion date: October 2015
    Detail: High-speed Train (Bergara-Gipuzkoa).

  • Parque la Benedicta

    Location: Portugalete.
    Completion date: July 2012
    Detail: Residential area Parque la Benedicta (Portugalete-Bizkaia).

  • South Metropolitan Turnoff Road

    Location: Trapaga.
    Completion date: September 2011
    Detail: South Metropolitan Turnoff Road (Trapagaran-Bizkaia).

  • Enguera Wind Farm

    Location: Enguera Wind Farm (Valencia).
    Completion date: 2009
    Supplies made: Concrete.
    Detail: Performance of concrete foundation for wind turbines.

  • A-23 Motorway Castellón

    Location: A-23 Motorway (Castellón).
    Completion date: 2007
    Supplies made: Concrete.
    Detail: Jersey barrier, structures, hard-shoulders and panels.

  • Chanelling of Barrnaco de Fraga

    Location: Chanelling of Barranco de Fraga - Castellón.
    Completion date: 2011
    Supplies made: Concrete.
    Detail: Lower slabs, walls, upper slabs.

  • Restoration of Algar bridge

    Location: Restoration Algar del Palancia bridge - Castellón.
    Completion date: 2014
    Supplies made: Self-compacting concrete.
    Detail: Restoration of the bridge.

  • Water trap Vera-Palmaret

    Location: Water trap Vera-Palmaret (Valencia).
    Completion date: 2013
    Supplies made: Concrete.
    Detail: Lower slabs, walls, upper slabs.

  • Dock inner harbour 2 Sagunto Port

    Location: Dock inner harbour 2 - Sagunto Port.
    Completion date: 2011
    Supplies made: Concrete.
    Detail: Dock and capping beam.